PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued grinding-repairing the the inside Stairwell -5(800x600).jpg Continued installing rebar at the slab on deck 3rd Floor Facing North-East  (800x600).jpg Core drilled holes for the electrical conduit at Elect. Room 284 Facing West (800x600).jpg Duct hangers at the 1st floor Facing South-East (800x600).jpg Installed conduit at IT-Phone Room 283 Facing South-West (800x600).jpg
Next page Continued grinding-repairing the the inside Stairwell -5(800x600)
Continued grinding-repairing the the inside Stairwell -5(800x600)